Development Intent
AtlasBarking and DagenhamOfficersHarry Moorhouse
Case officer · Barking And Dagenham Planning

Harry Moorhouse.

Last recorded decision Jan 2021 — no decisions in this record since

A case officer at Barking And Dagenham with an approval rate of 61% across 126 decided planning applications, spanning 18 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer126 decisions61% approvalSave
Barking And Dagenham · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
126
Applications
2020–21
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%61%202062%2021
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate61% · 19th of 29
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports199 officer reports parsed
0%
Approves despite concerns
of approvals record a documented reservation
0%
Negotiated approvals
approvals mentioning revisions/amendments
7%
"On balance" reports
reports using explicit balancing language
67%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Barking And Dagenham's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Barking And Dagenham reports. Attention, not stance.

Precedent & consistency
2.92× borough avg
Privacy & overlooking
1.07× borough avg
Outlook & amenity
1.07× borough avg
Materials & detailing
0.93× borough avg
Daylight & sunlight
0.91× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Moorhouse's caseload is dominated by householder extensions, and he is distinctive for explicitly tracking a site's history of PRIOR REFUSALS for the same or a similar scheme — naming the exact application references and the exact reason-for-refusal wording used previously — and then assessing whether the current resubmission has addressed that specific reason, rather than reassessing the scheme from scratch. He is also careful to flag where a permitted-development consent (e.g. a prior-approval extension) has NOT yet been implemented, treating the unbuilt permitted scheme as the correct baseline for assessing a new full-application variant on the same footprint.

Observable habits

· names the exact application references and exact reason-for-refusal wording from prior refused applications on the same site, then explicitly assesses whether the current resubmission addresses that SPECIFIC prior reason rather than reassessing from scratch

· treats an unbuilt but valid permitted-development consent (e.g. a prior-approval extension not yet constructed) as the correct comparison baseline for a new full-application variant on the same footprint, rather than the as-built current state

· flags a live, pending related application on the same site as a material consideration that could change the basis of a current Certificate of Lawfulness assessment

What their reports consistently look for

· the exact application reference and exact wording of any prior refusal reason for a similar scheme on the same site, and whether the current resubmission specifically addresses it

· whether a previously granted but unbuilt permitted-development consent (e.g. prior-approval extension) forms the correct baseline for comparing a new full-application proposal

· whether a live, pending related application on the same site would materially change the currency of the assessment being made

Assigned Harry Moorhouse on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

The proposed garage by virtue of its design, scale and siting results in an unacceptable form of development that is unduly prominent in relation to the existing dwelling and out of character with the surrounding area

20/01165/HSE

Officer recognise that application 20/01170/HSE is pending consideration. the applicant should be aware that the assessment undertaken herein is based on the date this certificate application was submitted

20/01159/CLUP

Measured from 199 published Barking And Dagenham officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 199 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

BP8
22 times cited
GG1
21 times cited
CM1
21 times cited
CP3
21 times cited
BP11
21 times cited
GG3
18 times cited
D4
18 times cited
D3
17 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2020–21.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
21/00105/FULL
Full Planning Permission
Refused
2021-02-26
20/02498/FULL
Full Planning Permission
Refused
2021-02-24
21/00105/FULL
Full Planning Permission
Refused
2021-02-26
20/02498/FULL
Full Planning Permission
Refused
2021-02-24
Full application history locked
Subscribe to see all 126 decisions →
Consultants approved most— subscriber data
1. Cityscape PA
2. GET RAPID PLANS
3. Civils Consulting Ltd
4. Livarch Ltd
At a glance
OfficerHarry Moorhouse
RolePlanning officer
Experience
Applications126 (2020–21)
Approval rate61%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Barking And Dagenham planning register and published decision notices, 2020–21. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Barking And Dagenham decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 199 published Barking And Dagenham officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.