Development Intent
AtlasBexleyOfficersHenry Stone
Case officer · Bexley Planning

Henry Stone.

Active — last recorded decision May 2026

A case officer at Bexley with an approval rate of 95% across 178 decided planning applications, spanning 8 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer178 decisions95% approvalSave
Bexley · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
178
Applications
2025–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%94%202595%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate95% · 5th of 31
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports194 officer reports parsed
2%
Approves despite concerns
of approvals record a documented reservation
2%
Negotiated approvals
approvals mentioning revisions/amendments
0%
"On balance" reports
reports using explicit balancing language
92%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Bexley's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Bexley reports. Attention, not stance.

Bulk & massing
2.98× borough avg
Materials & detailing
2.49× borough avg
Character & heritage
1.95× borough avg
Privacy & overlooking
1.24× borough avg
Trees & landscape
1.1× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Stone's caseload is distinctive for RETROSPECTIVE outbuilding retention applications where he systematically measures distance to EVERY surrounding neighbouring boundary (naming each adjoining road and property in turn — Maxwell Road, Hook Lane, Huxley Road) with precise metre figures, rather than focusing only on the most-affected neighbour. He is also notable for engaging with objections that raise non-planning matters (environmental impact of construction noise/smoke, alleged historic tree removal) by explicitly stating they are 'not a material planning consideration' rather than silently ignoring them. On lawful development certificates he applies a structured 4-year/10-year immunity framework, cross-referencing satellite imagery, sales records and the specific legislative regime in force at the time of construction (the pre-2024 four-year rule vs the Levelling-up and Regeneration Act 2023's unified 10-year period) to reach a 'balance of probability' finding.

Observable habits

· on retrospective outbuilding retention, systematically measures and states the distance to EVERY surrounding neighbouring property/road by name, not just the most-affected one, before reaching an overall amenity finding

· explicitly labels objections raising non-planning matters (construction noise/smoke complaints, historic tree removal) as 'not a material planning consideration' rather than silently disregarding them

· on LDCE applications, applies the correct legislative immunity regime (pre-2024 four-year rule vs LURA 2023's unified 10-year period) based on the construction date, cross-referenced against satellite imagery and sales records to reach a balance-of-probability finding

What their reports consistently look for

· the precise distance (metres) from a retrospective structure to EVERY surrounding neighbouring boundary, not only the closest or most obviously affected one

· whether an objection raises a genuine material planning consideration or a non-planning matter (noise/nuisance during construction, environmental concerns) that should be stated as immaterial rather than ignored

· which enforcement-immunity legislative regime (four-year vs the Levelling-up and Regeneration Act 2023's ten-year period) applies given the structure's construction date, checked against satellite imagery and sales records

Assigned Henry Stone on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

This matter is not a material planning consideration in relation to the retention of the outbuilding and does not impact the assessment of the application

25/01454/FUL

The development clearly pre-dates the commencement of the unified 10-year enforcement period introduced by the Levelling-up and Regeneration Act 2023 and therefore is immune from enforcement by virtue of the passage of time

26/00141/LDCE

Measured from 194 published Bexley officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 194 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

D4
1 times cited
D5
1 times cited
SP1
1 times cited
SP5
1 times cited
DP11
1 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2025–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
26/00703/FUL
Detailed Planning Application
Approved
2026-06-08
26/00724/FUL
Detailed Planning Application
Approved
2026-06-08
26/00703/FUL
Detailed Planning Application
Approved
2026-06-08
26/00724/FUL
Detailed Planning Application
Approved
2026-06-08
Full application history locked
Subscribe to see all 178 decisions →
Consultants approved most— subscriber data
1. RT Drafting Solutions Ltd
2. Design Studio
3. King Group holdings Ltd
4. Academy Estate Consultants
At a glance
OfficerHenry Stone
BoroughBexley
RolePlanning officer
Experience
Applications178 (2025–26)
Approval rate95%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Bexley planning register and published decision notices, 2025–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — Bexley's decision-notice parsing is limited coverage, so no borough or officer figure is shown.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 194 published Bexley officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.