Development Intent
AtlasHackneyOfficersMicheal Garvey
Case officer · Hackney Planning

Micheal Garvey.

Active — last recorded decision Apr 2026

A case officer at Hackney with an approval rate of 74% across 659 decided planning applications, spanning 21 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer659 decisions74% approvalSave
Hackney · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
659
Applications
2020–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%63%202079%202165%202266%202386%202478%202579%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate74% · 33rd of 52
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports558 officer reports parsed
29%
Approves despite concerns
of approvals record a documented reservation
10%
Negotiated approvals
approvals mentioning revisions/amendments
4%
"On balance" reports
reports using explicit balancing language
77%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Hackney's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Hackney reports. Attention, not stance.

Trees & landscape
2.12× borough avg
Flooding & drainage
1.18× borough avg
Materials & detailing
1.08× borough avg
Character & heritage
1.07× borough avg
Noise & disturbance
1.03× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Garvey's listed-building casework repeatedly works room-by-room and floor-by-floor through internal alterations, and he is comfortable flagging unauthorised works discovered on site visits (rooflights, removed partitions) as a distinct issue from the application itself. His design write-ups on roof extensions cite specific SPD thresholds (roof-width percentage, set-back from ridge) rather than a general design judgement.

Observable habits

· flags unauthorised/undocumented works found on a site visit as a separate procedural issue rather than folding them into the general design assessment

· cites specific SPD percentage/dimension thresholds (e.g. spanning more than 50% of roof width, set-back from ridge) rather than a general design judgement

· poses direct rhetorical questions about whether a less invasive structural solution would suffice before accepting a more extensive intervention in a listed building

What their reports consistently look for

· what this officer's reports consistently look for: whether unauthorised works are visible on a site visit that the application itself doesn't disclose

· what this officer's reports consistently look for: the exact SPD percentage/dimension a roof extension is measured against, not just a qualitative view

· what this officer's reports consistently look for: whether a less invasive structural approach could have avoided the need for the proposed intervention in a listed building

Assigned Micheal Garvey on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

The development would significantly breach the guidelines in the SPD, in respect of spanning more than 50% of the roof width and having hardly no set back from the roof ridge. As a consequence, the proposed roof extension would be a dominant feature

2020/0042

However, following a site visit there are real concerns the walls to two bedrooms at second floor level have been removed without consent, with only the timber frames exposed. This is unacceptable to remove walls and detrimental to the internal fabric of the listed building.

2020/0162

Would the reinstatement of the original structural elements be sufficient to not require the installation of this extent of steel beams? The proposal would affect the internal fabric of the special interest of the listed building as the internal alterations are considered unacceptable

2020/0162

Measured from 558 published Hackney officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 558 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

LP2Development and Amenity
224 times cited
D4Allocation: Mixed-use including residential
214 times cited
LP1Part A will be applied having regard to the scale and location of the
206 times cited
D3Allocation: Mixed-use including residential
124 times cited
LP33Hackney Central and Dalston
97 times cited
LP3Designated Heritage Assets
93 times cited
HC1Allocation: Mixed use
92 times cited
G6
87 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2020–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
2025/2498
Householder Planning
Approved
2026-06-01
2025/2202
Full Planning Permission
Approved
2026-05-21
2025/2498
Householder Planning
Approved
2026-06-01
2025/2202
Full Planning Permission
Approved
2026-05-21
Full application history locked
Subscribe to see all 659 decisions →
Consultants approved most— subscriber data
1. SAM Planning services
2. Eade Planning Ltd
3. Redwoods Projects Ltd
4. MDM Planning Ltd
At a glance
OfficerMicheal Garvey
BoroughHackney
RolePlanning officer
Experience
Applications659 (2020–26)
Approval rate74%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Hackney planning register and published decision notices, 2020–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Hackney decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 558 published Hackney officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.