Development Intent
AtlasHarrowOfficersFergus Freeney
Case officer · Harrow Planning

Fergus Freeney.

Active — last recorded decision May 2026

A case officer at Harrow with an approval rate of 68% across 367 decided planning applications, spanning 17 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer367 decisions68% approvalSave
Harrow · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
367
Applications
2020–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%76%202157%202265%202354%2024100%202533%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate68% · 44th of 72
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports29 officer reports parsed
20%
Approves despite concerns
of approvals record a documented reservation
13%
Negotiated approvals
approvals mentioning revisions/amendments
24%
"On balance" reports
reports using explicit balancing language
74%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Harrow's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Harrow reports. Attention, not stance.

Noise & disturbance
1.97× borough avg
Trees & landscape
1.75× borough avg
Daylight & sunlight
1.41× borough avg
Transport & parking
1.17× borough avg
Outlook & amenity
0.9× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Freeney's refusals frequently isolate a single design element as the reason for refusal while explicitly stating other design/amenity aspects were acceptable, distinguishing his approach from wholesale-refusal reasoning; he pays close, quantified attention to noise impact from mechanical plant (air conditioning/heat pump units), requiring bespoke noise impact assessments where multiple units are combined. His Green Belt reports name the specific NPPF paragraph test alongside the exact percentage floor-area increase from the original building.

Observable habits

· isolates a single design element (e.g. plant equipment visibility, roof pitch alteration) as the sole reason for refusal while explicitly stating other aspects of the same scheme are acceptable

· requires a bespoke, cumulative noise impact assessment where multiple items of mechanical plant (A/C units plus air source heat pumps) are proposed together, rather than accepting a single-unit MCS calculation

· cites the exact percentage floor-area/volume increase from the ORIGINAL building (not just the existing) when assessing Green Belt proportionality

What their reports consistently look for

· what this officer's reports consistently look for: whether a cumulative, bespoke noise impact assessment covers ALL proposed mechanical plant units together, not just a single-unit manufacturer calculation

· what this officer's reports consistently look for: the percentage floor-area or volume increase measured against the ORIGINAL building on Green Belt sites, not only the existing one

· what this officer's reports consistently look for: whether roof dormers achieve 'visual containment' per the specific SPD paragraph reference before accepting scale

Assigned Fergus Freeney on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

a bespoke, full Noise Impact Assessment would be required in order to assess the cumulative impact on neighbouring residential amenity from all the proposed units

PL/0431/23

It is noted that this is a substantial increase in the floor area above that of the original and existing

PL/0608/23

Measured from 29 published Harrow officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 29 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

D3
17 times cited
D12
16 times cited
DM1Achieving a High Standard of Development
15 times cited
CS1.B
11 times cited
DM10On Site Water Management and Surface Water Attenuation
11 times cited
T5
7 times cited
T6.1
6 times cited
D6
5 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2020–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
PL/0341/26
Full Planning Application
Approved
2026-04-09
PL/0341/26
Full Planning Application
Approved
2026-04-09
Full application history locked
Subscribe to see all 367 decisions →
Consultants approved most— subscriber data
1. Extending My Home
2. ICREATE DESIGNS LIMITED
3. SSK Architects Ltd
4. DesignLabs London Ltd
At a glance
OfficerFergus Freeney
BoroughHarrow
RolePlanning officer
Experience
Applications367 (2020–26)
Approval rate68%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Harrow planning register and published decision notices, 2020–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Harrow decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 29 published Harrow officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.