Development Intent
AtlasCroydonOfficersBarry Valentine
Case officer · Croydon Planning

Barry Valentine.

Active — last recorded decision May 2026

A case officer at Croydon with an approval rate of 68% across 70 decided planning applications, spanning 13 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer70 decisions68% approvalSave
Croydon · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
70
Applications
2020–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%100%202071%202183%202244%202367%202475%202563%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate68% · 47th of 83
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports36 officer reports parsed
6%
Approves despite concerns
of approvals record a documented reservation
6%
Negotiated approvals
approvals mentioning revisions/amendments
6%
"On balance" reports
reports using explicit balancing language
84%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Croydon's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Croydon reports. Attention, not stance.

Noise & disturbance
2.53× borough avg
Flooding & drainage
1.4× borough avg
Outlook & amenity
1.04× borough avg
Character & heritage
0.86× borough avg
Transport & parking
0.8× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Valentine's caseload spans a wide range of infrastructure applications (telecoms masts, substations, EV charging), and he is distinctive for explicitly citing NAMED prior/pending planning applications on adjoining sites (with their own references) to establish the streetscene baseline against which a new structure's height or scale is judged, particularly for masts and substations on commercial corners. On residential unit-loss applications he is willing to weigh a net loss of ONE home against the fact that the replacement unit meets a genuine strategic need (a 3-bed family home), treating the trade-off explicitly rather than applying SP2.2's no-net-loss principle as an absolute bar.

Observable habits

· cites named prior or pending planning applications on adjoining sites, with their own references, to establish the streetscene baseline height/scale against which a new mast, substation or plant structure is judged

· explicitly weighs a net loss of one dwelling unit against the strategic benefit of the replacement providing a genuinely needed unit type (e.g. a 3-bed family home), rather than treating a no-net-loss policy as an absolute bar

· measures the specific distance in metres from a new plant/vent/substation installation to the nearest neighbouring habitable window as the operative amenity test

What their reports consistently look for

· named prior or pending planning applications (with their own references) on adjoining sites establishing the height/scale baseline for new infrastructure

· whether a net loss of one dwelling unit is offset by the strategic benefit of the replacement unit meeting a genuinely needed housing type

· the precise distance in metres from a new plant, vent or substation installation to the nearest neighbouring habitable window

Assigned Barry Valentine on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

has confirmed that there are no existing installations that could be upgraded to meet the coverage requirements, and that surrounding sites have been fully optimised

21/01296/FUL

this needs to be weighed against that the fact that by losing a unit, the borough would gain a three bed unit, which there is a great need for

21/03753/FUL

Measured from 36 published Croydon officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 36 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

DM10Design and character
3 times cited
7.1
1 times cited
7.4
1 times cited
7.5
1 times cited
7.6
1 times cited
3.5
1 times cited
DM18.1
1 times cited
SP1Growth in Croydon 2019-2040
1 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2020–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
25/04001/FUL
Full planning permission
Refused
2026-05-06
26/01330/FUL
Full planning permission
2026-05-05
25/04001/FUL
Full planning permission
Refused
2026-05-06
26/01330/FUL
Full planning permission
2026-05-05
Full application history locked
Subscribe to see all 70 decisions →
Consultants approved most— subscriber data
1. Extending My Home
2. Collins & Coward
3. Grainger Planning Associates Ltd
4. Pegasus Group
At a glance
OfficerBarry Valentine
BoroughCroydon
RolePlanning officer
Experience
Applications70 (2020–26)
Approval rate68%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Croydon planning register and published decision notices, 2020–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Croydon decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 36 published Croydon officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.