Christopher Grace.
Active — last recorded decision Apr 2026
A case officer at Croydon with an approval rate of 47% across 352 decided planning applications, spanning 24 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.
Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Croydon reports. Attention, not stance.
Mark = borough average (1×). Bar capped at 2×.
Grace's reports read as strongly pre-application-aware, repeatedly noting where a scheme's design was already discussed and refined during pre-app discussions before the formal submission, and citing the exact reduction achieved since (e.g. a depth cut back from pre-app stage to meet the Suburban Design Guide's separation-distance guidance). He runs precise parking-stress-survey percentage evidence against the borough's 90% stress threshold, and is willing to refuse purely on refuse/waste-location grounds even where design and neighbour-amenity tests otherwise pass, treating unresolved waste-storage detail as a standalone policy conflict rather than a conditionable afterthought.
· notes explicitly where a scheme has already been through pre-application discussion and cites the specific design change achieved since (e.g. depth reduced to meet Suburban Design Guide separation-distance guidance) as evidence the applicant engaged constructively
· quotes the exact parking-stress-survey percentage figure against the commonly used 90% stress threshold before concluding whether additional car demand from a scheme is acceptable
· treats refuse/waste storage that lacks demonstrated capacity, security, or screening as an independent policy conflict under DM13, capable of sustaining a refusal on its own rather than being folded into a wider design judgement
· explicit evidence that a scheme's design was refined through pre-application discussion, with the specific change quantified
· a parking-stress-survey percentage figure tested against the 90% stress threshold, not just PTAL proximity to transport
· demonstrated refuse-storage capacity, security and screening under DM13, treated as capable of sustaining a refusal alone
“The depth of the rear extension has been reduced from pre-application stage to respect the guidance outlined in the Suburban Design Guide (SPD2) the separation distance between new to new dwellings should be 12m”
20/00559/FUL
“76% parking stress within Zone W (Zone in which the property is located) and an anticipated demand from the 4 additional units of 2 cars. This additional demand would not breach the 90% level commonly used to indicate stressed parking”
20/00559/FUL
Measured from 158 published Croydon officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.
The policies this officer cites most in their own reports — times cited across 158 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.
Show all 24 rows
Where this officer's caseload concentrates, 2020–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.
- [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Croydon planning register and published decision notices, 2020–26. · methodology
- [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
- [3]Condition load — mean effective conditions attached to Croydon decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
- [4]"How this officer decides", the policy playbook and all quotes — parsed from 158 published Croydon officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.