Development Intent
AtlasCroydonOfficersFiza Meeraj
Case officer · Croydon Planning

Fiza Meeraj.

Active — last recorded decision May 2026

A case officer at Croydon with an approval rate of 87% across 58 decided planning applications, spanning 13 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer58 decisions87% approvalSave
Croydon · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
58
Applications
2025–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%100%202582%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate87% · 6th of 83
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports29 officer reports parsed
35%
Approves despite concerns
of approvals record a documented reservation
9%
Negotiated approvals
approvals mentioning revisions/amendments
3%
"On balance" reports
reports using explicit balancing language
93%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Croydon's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Croydon reports. Attention, not stance.

Bulk & massing
3.27× borough avg
Flooding & drainage
2.9× borough avg
Daylight & sunlight
2.25× borough avg
Outlook & amenity
1.69× borough avg
Materials & detailing
1.66× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Meeraj's caseload spans householder extensions, retrospective/unlawful works and tree-protected sites, and she is distinctive for methodically working through a genuine lawfulness assessment on unauthorised as-built works — comparing the specific dimensions actually built against BOTH the original Lawful Development Certificate that was approved AND the GPDO criteria the built form would need to satisfy, identifying the specific technical breach (e.g. removal of eaves) that defeats the fallback position. On established local character she cites MULTIPLE named comparable properties on the SAME street with matching extension type and scale as evidence a proposal is consistent with the prevailing pattern.

Observable habits

· methodically compares as-built unauthorised works against BOTH an originally-approved Lawful Development Certificate and the GPDO criteria the built form would need to independently satisfy, identifying the specific technical breach (e.g. eaves removal) that defeats any fallback position

· cites multiple named comparable properties on the same street with matching extension type and scale as evidence a proposal is consistent with the established local pattern of development

· refuses outbuilding/extension applications near TPO-protected trees where no tree survey or BS5837-compliant arboricultural impact assessment has been submitted, treating the absence of evidence as determinative rather than assuming acceptability

What their reports consistently look for

· the specific technical dimensional or design breach (e.g. eaves removal) that distinguishes as-built unauthorised works from both an approved LDC and independent GPDO compliance

· multiple named comparable properties on the same street with matching extension type and scale as evidence of an established local development pattern

· whether a BS5837-compliant tree survey and arboricultural impact assessment has been submitted for development near TPO-protected trees

Assigned Fiza Meeraj on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

The roof extension/vertical rear first floor extension is unlawful, for example permitted development rights for roof extension do not allow for removal of eaves.

25/03056/HSE

The submitted application does not include a tree survey, arboricultural impact assessment, or any supporting information in accordance with BS5837:2012

26/00536/HSE

Measured from 29 published Croydon officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies cited most on decision notices for applications Fiza Meeraj decided — 23 parsed notices. From the published notices themselves; their own report wording is parsed separately.

D12London Plan
17 times cited
DM25Sustainable Drainage Systems and reducing flood riskCroydon plan
7 times cited
SP4Urban Design, Heritage and Local CharacterCroydon plan
3 times cited
DM10Design and characterCroydon plan
3 times cited
D3London Plan
2 times cited
D4London Plan
2 times cited
D6London Plan
1 times cited
T4London Plan
1 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward
Recent applications
Address
Reference
Type
Outcome
Date
26/01007/HSE
Householder Application
Approved
2026-06-04
26/01126/HSE
Householder Application
Approved
2026-06-04
26/01007/HSE
Householder Application
Approved
2026-06-04
26/01126/HSE
Householder Application
Approved
2026-06-04
Full application history locked
Subscribe to see all 58 decisions →
Consultants approved most— subscriber data
1. LPR Design
2. CANOPY PLANNING SERVICES LTD
3. PLANS BY PARK LTD
4. M.J.Read Building Design
At a glance
OfficerFiza Meeraj
BoroughCroydon
RolePlanning officer
Experience
Applications58 (2025–26)
Approval rate87%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Croydon planning register and published decision notices, 2025–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Croydon decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 29 published Croydon officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.