Last recorded decision Jul 2021 — no decisions in this record since
A case officer at Hackney with an approval rate of 68% across 113 decided planning applications, spanning 21 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.
Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Hackney reports. Attention, not stance.
Mark = borough average (1×). Bar capped at 2×.
Moore's amenity sections track a proposal's impact against each individually named adjoining property in turn, explicitly comparing the proposed and existing finished floor levels rather than just heights, and she is comfortable citing a related retrospective permission on the same site (a different reference number) as directly relevant context.
· compares proposed and existing FINISHED FLOOR LEVELS between neighbouring extensions, not just their heights
· cross-references a related retrospective permission (different reference) on the same site as directly relevant context
· counts the specific arboricultural report's named tree references (T01, T02 etc.) individually rather than a general tree statement
· what this officer's reports consistently look for: the finished floor level of a proposed extension compared against the neighbouring extension's own finished floor level, not just relative height
· what this officer's reports consistently look for: a related retrospective permission on the same site under a different reference number
· what this officer's reports consistently look for: individual tree references (T01, T02, etc.) from the arboricultural report addressed one by one rather than as a block
“The proposed extension will extend approximately 1.4 metres beyond the rear elevation of the existing extension at no. 31, and will have a height of 3 metres, noting that the finished floor level of the extension at no. 31 is sited above the proposed finished floor level.”
2020/0009
“Moreover, retrospective permission has been granted for this amalgamation under reference no. 2020/0008.”
2020/0009
“This indicates that a protection plan and construction works can be undertaken in a manner in which the health of trees both within the site, and on neighbouring properties, will be protected.”
2020/0060
Measured from 108 published Hackney officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.
The policies this officer cites most in their own reports — times cited across 108 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.
Show all 21 rows
Where this officer's caseload concentrates, 2020–21.[1] Click the map above to focus this page on a ward, or a row to open the ward.
- [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Hackney planning register and published decision notices, 2020–21. · methodology
- [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
- [3]Condition load — mean effective conditions attached to Hackney decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
- [4]"How this officer decides", the policy playbook and all quotes — parsed from 108 published Hackney officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.