Development Intent
AtlasEalingOfficersChristopher Neelands
Case officer · Ealing Planning

Christopher Neelands.

Active — last recorded decision Apr 2026

A case officer at Ealing with an approval rate of 76% across 439 decided planning applications, spanning 26 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer439 decisions76% approvalSave
Ealing · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
439
Applications
2020–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%83%202276%202382%202474%202562%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate76% · 37th of 44
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports125 officer reports parsed
24%
Approves despite concerns
of approvals record a documented reservation
1%
Negotiated approvals
approvals mentioning revisions/amendments
6%
"On balance" reports
reports using explicit balancing language
70%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Ealing's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Ealing reports. Attention, not stance.

Noise & disturbance
2.14× borough avg
Flooding & drainage
2.12× borough avg
Energy & sustainability
1.78× borough avg
Transport & parking
1.55× borough avg
Outlook & amenity
1.31× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Neelands' reports are built around a stable roman-numeral "key considerations" list (Design and local character / Impact on neighbour amenity / Impact on transport) repeated near-verbatim across most reports, and he is precise about which specific London Plan policy pairing (D3/D4) governs design in every case, citing them as a fixed pair rather than selecting individually. He also directly compares a resubmitted scheme against a previously APPROVED permission on the same site rather than only against refusals, stating explicitly where nothing has changed policy-wise since that approval.

Observable habits

· opens nearly every report with the same stable roman-numeral key-considerations list (design and local character / neighbour amenity / transport) as the report's skeleton

· cites London Plan policies D3 and D4 as a fixed pair for design assessment rather than selecting a single applicable policy

· when reassessing a resubmitted scheme, states explicitly that policy has not changed since a specific prior APPROVAL (not just a refusal) on the same site, using that approval as the benchmark

What their reports consistently look for

· what this officer's reports consistently look for: the same roman-numeral key-considerations list applied as a template across design, amenity and transport in nearly every report

· what this officer's reports consistently look for: a specific PRIOR APPROVAL (not merely a refusal) on the same site as the benchmark for a resubmitted or near-identical scheme

· what this officer's reports consistently look for: whether NPPF policy or the local development plan has changed since that prior approval, as the deciding factor in whether further assessment is needed

Assigned Christopher Neelands on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

The key considerations of this proposal are: i. Design and local character ii. Impact on neighbour amenity iii. Impact on transport/ loss of parking

222011HH

Since the approval of planning permission ref. 217174HH, there has been no change in policy in regard to the NPPF, London Plan and Ealing's local development plan documents. For these reasons, further assess

222725HH

Measured from 125 published Ealing officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 125 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

D4
83 times cited
D3
76 times cited
D6
42 times cited
D5
32 times cited
T4
28 times cited
T5
26 times cited
SPD 4
26 times cited
HC1
26 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2020–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
261153LBC
Listed Building Consent
Approved
2026-06-08
261188FUL
Full Application
Refused
2026-05-26
261153LBC
Listed Building Consent
Approved
2026-06-08
261188FUL
Full Application
Refused
2026-05-26
Full application history locked
Subscribe to see all 439 decisions →
Consultants approved most— subscriber data
1. chalkline
2. Multi Creation
3. MZA Planning
4. Studio 136 Architects Ltd
At a glance
OfficerChristopher Neelands
BoroughEaling
RolePlanning officer
Experience
Applications439 (2020–26)
Approval rate76%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Ealing planning register and published decision notices, 2020–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Ealing decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 125 published Ealing officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.