Development Intent
AtlasEalingOfficersJames Maloney
Case officer · Ealing Planning

James Maloney.

Last recorded decision Jun 2024 — no decisions in this record since

A case officer at Ealing with an approval rate of 77% across 584 decided planning applications, spanning 29 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer584 decisions77% approvalSave
Ealing · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
584
Applications
2020–24
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%70%202078%202181%202273%202383%2024
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate77% · 32nd of 44
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports185 officer reports parsed
25%
Approves despite concerns
of approvals record a documented reservation
4%
Negotiated approvals
approvals mentioning revisions/amendments
5%
"On balance" reports
reports using explicit balancing language
66%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Ealing's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Ealing reports. Attention, not stance.

Precedent & consistency
1.83× borough avg
Energy & sustainability
1.28× borough avg
Character & heritage
1.23× borough avg
Daylight & sunlight
1.18× borough avg
Bulk & massing
1.11× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Maloney's design assessments lean heavily on a specific, comparable-precedent style of reasoning: he identifies the exact neighbouring properties (by number) that already carry a similar extension and measures the proposal's depth/height/setback against them directly, rather than relying on abstract policy language alone. He is also notably willing to invoke an unimplemented prior approval or planning permission on the SAME site as a "fall-back position" that lowers the bar for the current scheme.

Observable habits

· names specific neighbouring addresses with their existing extension dimensions as the direct comparator for the proposal under assessment

· treats an unimplemented but extant permission on the same site (including prior approvals) as a fall-back position that is a material consideration in favour of a similar new scheme

· runs through neighbour-by-neighbour impact assessments addressing each side (east/west or north/south) as its own labelled block

What their reports consistently look for

· what this officer's reports consistently look for: a named, dimensioned comparator extension at a specific neighbouring address, not just a general claim that similar development exists nearby

· what this officer's reports consistently look for: whether an extant but unimplemented permission on the same site could be built without further consent, which is then used to benchmark the acceptability of the current proposal

· what this officer's reports consistently look for: separation distance and screening (e.g. an existing garage) between the extension and each individual neighbour in turn

Assigned James Maloney on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

Given there is no increase in depth proposed for the existing extension on the boundary with this neighbour, only an increase in height from a flat roof of 2.35m to a mono-pitched roof with an eave's height of 2.35m and a ridge height of 3.1m

200515HH

As referenced above, the 6m singe storey rear extension, the hip to gable roof alteration and the rear roof extension were previously approved under planning ref. 200572PALHE and 200554CPL. Given that these elements could be constructed without any further consent, the proposed single storey rear extension, hip to gable roof alteration and dormer extension would have an acceptable impact upon the character and appearance of the site and surrounding area

201687FUL

Measured from 185 published Ealing officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 185 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

D4
78 times cited
D3
56 times cited
D6
50 times cited
D5
43 times cited
D8
21 times cited
SPD 4
20 times cited
HC1
19 times cited
GG1
19 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2020–24.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
241451FUL
Full Application
Approved
2024-12-04
230760FUL
Full Application
Approved
2024-11-29
241451FUL
Full Application
Approved
2024-12-04
230760FUL
Full Application
Approved
2024-11-29
Full application history locked
Subscribe to see all 584 decisions →
Consultants approved most— subscriber data
1. PLANS 4 U LTD.
2. Multi Creation
3. AH Architecture
4. Studio 136 Architects Ltd
At a glance
OfficerJames Maloney
BoroughEaling
RolePlanning officer
Experience
Applications584 (2020–24)
Approval rate77%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Ealing planning register and published decision notices, 2020–24. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Ealing decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 185 published Ealing officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.